
34
HL7 FHIR Balloting Timeline and Artifacts
(1/2)
Done
How Do We Get It Done? Why Do It?
Contact FHIR FMG of our upcoming plans and get
insight from them on action needed
Attend Jan 2019 HL7 WGM to present our
upcoming plans to FHIR, CBCP, and Other
Interested WGs (O&O, FM, PC)
HL7 recommends that prior to officially compiling
a ballot that a project considering developing a
ballot circulate and introduce the idea of the work
to the appropriate HL7 work groups. This allows
the work groups to provide guidance and
feedback before the formal ballot process begins.
1/18/19
Project
Scope
Statement
(PSS)
Modify the existing PSS for the eLTSS Informative
Need approval from: CBCP WG, FHIR
Management Group (FMG), US Realm Steering
Committee, Steering Division, Architectural
Review Board, and Technical Steering
Committee.
This form is the formal introduction of our work to
HL7 WGs. This form outlines the sponsoring
WGs, project team, project scope and need, and
any external drivers and dependencies.
Complete and submit to FHIR Management
Group (FMG)
Acceptance of proposal will result in the creation
of the eLTSS project within the HL7 framework.
Notification
of Intent to
Ballot (NIB)
Work with CBCP WG to complete and submit
form to HL7
This officially notifies HL7 of our projects intent to
move forward with a ballot for the May 2019
cycle.
Work with CBCP FHIR Liaison (John Moerhke)
Download and install appropriate HL7 FHIR IG
Tooling
Develop FHIR Sample Files
Populate required IG sections with Content
To validate and prioritize ballots and to develop
the framework to support the ballots, HL7 is
requiring a Functionally Complete IG as part of
the NIB package.
Submit Complete FHIR IG to HL7 for QA
HL7 requires a new QA period for all FHIR ballots
to ensure ballots are well developed prior to the
ballot period.
Complete and submit FINAL FHIR IG Content (all
text, profiles, sample files, etc.) to HL7.
ensures the ballot content and
structure is ready for ballot opening.